Concept site. Raftermark Roofing, its people, jobs and prices are fictional. Designed and built by Flare Built

Raftermark

See your new roof, and its price, before anyone climbs a ladder

Pick a roof and set the size of your house. The range is what we charge, posted here, not a teaser. The free inspection turns it into one fixed price that does not move.

Your roof
Storeys
Garage under the roof
How steep is it?

Architectural shingle, our price for your roof

$19,300 to $24,200

About 24.7 squares of roof. Lasts 25 to 30 years. The crew is with you 2 to 3 days.

Most Sacramento re-roofs are shingle: the lowest price, every colour we stock is cool-rated, and the crew is gone in days. It is the shortest-lived of the three, and summer heat is what ages it.

A range, not a quote: the free inspection turns it into one price, and it does not move after that.

Most roofers will not say a number until they are on your roof

We read the websites of the six largest home roofing companies in the country and ten that work in Sacramento. None of the six posted a roof price. One of the ten did.

So you call three roofers, take three mornings off, and compare three numbers that cover different work. We would rather you knew our range tonight, and called only if it fits.

National roofers posting a price
0 of 6
Sacramento roofers posting one
1 of 10

Do you need a new roof, or a repair?

Most roofers would rather sell you a roof. Answer two questions and we will say which way yours leans, before anyone comes out.

Check my roof in two questions

The Roof Report

A free inspection that ends in a fixed price, or an honest repair

Forty-five minutes on your roof and in your attic. Within a day you get every slope photographed and a plain answer: repair it or replace it. If it is a new roof, the report fixes the price in all three materials.

  • Photos of every slope and the atticIncluding the ones you cannot see from the street, which is where most roofs fail first.
  • Repair or replace, in writingIf a repair will do, the report says so and prices it. Most of ours come in between $450 and $1,800.
  • A fixed price in each materialShingle, tile and metal, each with the days it takes and what it adds to your power bill or takes off it.
  • What the city and your insurer will askPermit, the cool roof rule, and whether your insurer needs a roof certificate after the job.

Free, and it commits you to nothing. The report is yours to keep, and to show other roofers if you like.

Book the free inspection

The No-Surprise Re-Roof

The price in your report is the price you pay

Roofs go over budget for one reason: rotten deck nobody priced. So the first eight sheets of new deck are in every price, any more are $95 a sheet, and you get a photo of each one before it is replaced.

  • Tear-off to the boardsEvery old layer comes off, so nothing rotten is hidden under the new roof.
  • Up to eight sheets of new deckIncluded. More are $95 a sheet, each shown to you in a photo first.
  • Permit and cool roof paperworkWe pull the permit, use a cool-rated product and file the state form at the final inspection.
  • Your yard back the way it wasTarps over the plants, the dumpster gone the day we finish, and a magnet sweep for nails.
  • Ten years on our work, in writingPlus the maker's warranty on the roof itself, registered in your name before we leave.

If the final bill is a dollar over your report for anything we did not show you a photo of first, the difference is yours, plus $500.

Roof Care. After the first big rain each winter we check the roof, clear the gutters and send you the photos. $189 a year, and the first year is included with every new roof.

Roofs we have done near you

Every ring is a house where we replaced the roof. Press one to see what it cost, what we found under the old roof, and how long the crew was there.

8 roofs this year, 112 squares, every price on the map.

Press a ring on the map, or pick a roof from the list.

All 8 roofs on the map

Get on the roof before the rain does

Sacramento's rain comes from late November to March. We only tear off on days with a dry forecast, so winter starts book up first. We start three roofs a week, so we can finish each one before the next begins.

The three people you will meet

  • Dario Kessling

    Owner

    Has roofed in Sacramento since 2004 and started Raftermark in 2013 after one too many jobs where the price changed on the second day. Still climbs every tile roof before it is quoted.

  • Wren Takahara

    Estimator

    Does the inspections and writes every Roof Report. If you call about yours, Wren answers, and has the photos in front of her.

  • Abel Ostrowski

    Crew lead

    Runs the tear-off crew. Walks the yard with you before the first shingle comes off, and again with the magnet sweeper after the last nail goes in.